DJI FlyCart 100 sensing and safety system

Grid and utility logistics

Support the line without following the road.

Heavy-lift drone support for pylons, poles, substations and remote grid assets—designed around controlled worksites and time-critical maintenance.

SECTOR CAPABILITY
01

THE ACCESS PROBLEM

Linear infrastructure creates nonlinear logistics.

The nearest service road may be far from the actual defect or work front. LIFTGRID designs short aerial movements into controlled utility worksites while accounting for conductors, structures, electromagnetic environment and public access.

02

MISSION TYPES

Where LIFTGRID
can support.

Each example is a route to qualify, not a blanket promise to fly.

01

Pylon maintenance

Bring prepared tools and components to the ground team at isolated tower locations.

02

Storm recovery

Pre-plan priority supply routes for controlled repair areas after severe weather.

03

Remote substations

Move equipment across poor access where a road journey is slow or seasonally unreliable.

04

Project distribution

Create repeat lift plans along a defined section of infrastructure during scheduled works.

03

TYPICAL CARGO

Defined, weighed
and flight-ready.

Every item needs verified mass, dimensions, packaging, lifting points, value and dangerous-goods status.

01Insulators and fittings

02Earthing and line hardware

03Tools and test equipment

04Packaged repair assemblies

05Communications equipment

06Emergency work kits

Short

Aerial leg

Connect a practical roadhead to the actual work front.

Controlled

Utility worksite

Flight and ground activity integrate with the client's permit and safety systems.

Logged

Every movement

Payload, configuration, crew and flight records support repeat operations.

04

ROUTE QUALIFICATION

What makes a
credible first mission.

We need enough evidence to test both operational fit and commercial value.

STRONG FIT

Asset owner involvement

Known outage or work programme

Electromagnetic and obstacle survey

Controlled ground areas

Payload with approved lifting and packaging

WHAT TO SEND

Asset and work-front coordinates

Line status and electrical hazards

Permit-to-work interfaces

Load schedule and lifting points

Public access and land permissions

05

SECTOR FAQ

Before we
promise a route.

Can the aircraft fly close to live power lines?+

Only if electromagnetic, obstacle, containment and authority requirements are addressed in the approved concept of operations. It is not assumed safe from the aircraft specification alone.

Can LIFTGRID operate along an entire line route?+

Potentially, but extended or BVLOS operations require a more complex authorisation case. Launch missions should begin with bounded, controlled sections.

What utility cargo is excluded?+

Undeclared dangerous goods, loose or poorly rigged material, loads outside the mission envelope and any cargo the insurer or authorisation excludes.

Put a real route on the table.

Send the cargo, coordinates, frequency and access alternative.

Assess this route